Cited by 2
A New Approach for Solving Bi-Objective Redundancy Allocation Problem Using DOE, Simulation and ε-Constraint Method

Integration of Triple Sustainable Management by Considering the Multi-period Supply Chain for Next-Generation Fuel
Waqas Ahmed, Biswajit Sarkar, Mujtaba Hassan Agha
Book:  IFIP Advances in Information and Communication Technology (Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems) Volume 591 (2020), p. 217
Joint Multi-item Multi-supplier Sustainable Lot-Sizing Model Applying Combined BWM, TOPSIS, Possibilistic Programming, and ϵ-constraint Method
Krishnendu Shaw, Vijay Lahri, Ravi Shankar, Alessio Ishizaka
Journal:  IEEE Transactions on Engineering Management Volume 71 (2024), p. 4530