Cited by 2
A New Approach for Solving Bi-Objective Redundancy Allocation Problem Using DOE, Simulation and ε-Constraint Method

Integration of Triple Sustainable Management by Considering the Multi-period Supply Chain for Next-Generation Fuel
Waqas Ahmed, Biswajit Sarkar, Mujtaba Hassan Agha
Book  IFIP Advances in Information and Communication Technology (Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems) Volume 591 (2020), p. 217
Joint Multi-item Multi-supplier Sustainable Lot-Sizing Model Applying Combined BWM, TOPSIS, Possibilistic Programming, and ϵ-constraint Method
Krishnendu Shaw, Vijay Lahri, Ravi Shankar, Alessio Ishizaka
Journal  IEEE Transactions on Engineering Management Volume 71 (2024), p. 4530